The Q2-2011 diamond drill program was targeted to follow-up on some near-pit exploration results achieved in diamond drilling campaigns conducted in 2003-05 and 2007. A total of 847.5 metres in three diamond drill holes were collared less than 100 metres north of the ultimate pit wall. The program was limited to three diamond drill holes primarily based on a brief period of availability of a diamond drill rig and crew in the area of the mine. Results from the 2003-05 and 2007 drilling and locations of these drill holes are illustrated in Figure 1 - Surface Plan Anaconda Mining Pine Cove Mine, Figure 2 - Cross Section 295500E and Figure 3 - Cross Section 295550E.